Building material prices
Material and labor ranges by work type and grade. Labor = official market wage (published 2026-09-01) × labor input per unit; materials and labor input are estimates.
Request materialsRegister as a supplierMaterial supplier (dealer or maker)See home decor price rangesMonthly interior price report
BasicWindows (sash)Made to measurePetrochemical-based
Standard PVC windows
Basic insulation
- Material
- ₩110,000 ~ ₩150,000
- Labor
- ₩30,030 ~ ₩39,970
- Total
- ₩140,030 ~ ₩189,970
Window installer·General laborer avg. ₩225,792/day × 0.133–0.177 worker-days per unit
per floor ㎡
StandardWindows (sash)Made to measurePetrochemical-based
Branded double-glazed windows
Better insulation and soundproofing, lower heating bills
- Material
- ₩170,000 ~ ₩230,000
- Labor
- ₩39,970 ~ ₩55,090
- Total
- ₩209,970 ~ ₩285,090
Window installer·General laborer avg. ₩225,792/day × 0.177–0.244 worker-days per unit
per floor ㎡
PremiumWindows (sash)Made to measurePetrochemical-based
High-insulation system windows
Top energy-efficiency class
- Material
- ₩280,000 ~ ₩380,000
- Labor
- ₩55,090 ~ ₩70,000
- Total
- ₩335,090 ~ ₩450,000
Window installer·General laborer avg. ₩225,792/day × 0.244–0.31 worker-days per unit
per floor ㎡
Prices are reference estimates that vary by brand, site conditions and volume. Compare supplier quotes before buying. Origins show the general pattern and vary by manufacturer.
Price basis and sources
Labor = official market wage × labor input per unit. Labor input, materials and trade mix are estimates not yet checked against official data, so treat amounts as reference ranges.
- OfficialConstruction Association of Korea, 2026 H2 Construction Wage Survey (market wage rates, published 2026-09-01, surveyed May 2026)Source
- EstimateLabor input per unit (worker-days)To be checked against MOLIT's Standard Construction Estimating Guide
- EstimateTrade mix per work typeTo be checked against actual site data
- EstimateMaterial costsTo be checked against Public Procurement Service price data and price guides
- EstimateMaterial logistics (delivery, travel, hoisting, waste removal)To be replaced with partner supplier quotes and anonymous quote-check data
- EstimateRegion and occupied-home factors, 7% overhead
Construction Association of Korea, 2026 H2 Construction Wage Survey (market wage rates, published 2026-09-01, surveyed May 2026)
| 1002 | General laborer | ₩172,698 |
| 5014 | Demolition worker | ₩261,108 |
| 1024 | Window installer | ₩248,547 |
| 1075 | Electrician | ₩276,108 |
| 1028 | Tiler | ₩294,379 |
| 1029 | Painter | ₩268,225 |
| 1030 | Interior finisher | ₩258,904 |
| 1031 | Paperhanger | ₩229,833 |
| 1026 | Waterproofer | ₩233,163 |
| 1039 | Plumber | ₩249,073 |
| 1042 | Sanitary fitter | ₩221,435 |
| 1023 | Carpenter | ₩282,990 |
| 5012 | Flooring installer * | ₩257,926 |