Material and labor ranges by work type and grade. Labor = official market wage (published 2026-09-01) × labor input per unit; materials and labor input are estimates.

BasicDemolition & disposal
Demolition and waste disposal

Removal of existing finishes

Material
₩0
Labor
₩18,000 ~ ₩24,940
Demolition worker·General laborer avg. ₩216,903/day × 0.083–0.115 worker-days per unit
Total
₩18,000 ~ ₩24,940
per floor ㎡
StandardDemolition & disposal
Demolition with protection

Includes elevator and hallway protection

Material
₩1,000 ~ ₩2,000
Labor
₩21,910 ~ ₩29,930
Demolition worker·General laborer avg. ₩216,903/day × 0.101–0.138 worker-days per unit
Total
₩22,910 ~ ₩31,930
per floor ㎡
PremiumDemolition & disposal
Precision low-noise demolition

Uses equipment that minimizes complaints

Material
₩2,000 ~ ₩3,000
Labor
₩29,930 ~ ₩39,910
Demolition worker·General laborer avg. ₩216,903/day × 0.138–0.184 worker-days per unit
Total
₩31,930 ~ ₩42,910
per floor ㎡

Prices are reference estimates that vary by brand, site conditions and volume. Compare supplier quotes before buying. Origins show the general pattern and vary by manufacturer.

Price basis and sources

Labor = official market wage × labor input per unit. Labor input, materials and trade mix are estimates not yet checked against official data, so treat amounts as reference ranges.

  • OfficialConstruction Association of Korea, 2026 H2 Construction Wage Survey (market wage rates, published 2026-09-01, surveyed May 2026)Source
  • EstimateLabor input per unit (worker-days)To be checked against MOLIT's Standard Construction Estimating Guide
  • EstimateTrade mix per work typeTo be checked against actual site data
  • EstimateMaterial costsTo be checked against Public Procurement Service price data and price guides
  • EstimateMaterial logistics (delivery, travel, hoisting, waste removal)To be replaced with partner supplier quotes and anonymous quote-check data
  • EstimateRegion and occupied-home factors, 7% overhead
Construction Association of Korea, 2026 H2 Construction Wage Survey (market wage rates, published 2026-09-01, surveyed May 2026)
1002General laborer₩172,698
5014Demolition worker₩261,108
1024Window installer₩248,547
1075Electrician₩276,108
1028Tiler₩294,379
1029Painter₩268,225
1030Interior finisher₩258,904
1031Paperhanger₩229,833
1026Waterproofer₩233,163
1039Plumber₩249,073
1042Sanitary fitter₩221,435
1023Carpenter₩282,990
5012Flooring installer *₩257,926