Remodeling estimate
Pick your floor size, work and material grades to see estimated cost and duration.
㎡
Region
Distance to supplier/warehouse
Building type
Rural sites add delivery, travel and waste removal; apartments add hoisting.
Quick presets
Grade by work type
- Demolition & disposal
- Windows (sash)
- Electrical & outlets
- Bathroom
- Kitchen
- Tiles (entry & balcony)
- Entry partition door
- Interior doors
- Wallpaper
- Flooring
- Lighting
- Balcony painting
Estimated total cost
₩25.1M – ₩34.6M
₩5.9M – ₩8.2M per pyeong
About 19–26 days of work
Materials + labor
₩21.4M – ₩29.4M
Site overhead (7%)
₩1.5M – ₩2.1M
VAT (10%)
₩2.3M – ₩3.1M
Keep a ₩3.5M contingency on top (10% of total)
Breakdown
| Work | Qty | Cost |
|---|---|---|
Demolition & disposal Standard · Demolition with protection | 14 floor ㎡ | ₩320,000 – ₩450,000 |
Windows (sash) Standard · Branded double-glazed windows | 14 floor ㎡ | ₩2.9M – ₩4M |
Electrical & outlets Standard · Rewiring and added outlets | 14 floor ㎡ | ₩200,000 – ₩280,000 |
Bathroom Standard · Full strip-out remodel | 2 set | ₩9M – ₩12M |
Kitchen Standard · High-gloss + engineered stone | 0.8 set | ₩4.1M – ₩5.5M |
Tiles (entry & balcony) Standard · Porcelain tile | 1.1 ㎡ | ₩70,000 – ₩100,000 |
Entry partition door Standard · Triple-linked sliding door | 1 each | ₩1.8M – ₩2.4M |
Interior doors Standard · ABS door replacement | 5 each | ₩1.3M – ₩1.8M |
Wallpaper Standard · Vinyl (silk) wallpaper | 42 ㎡ | ₩500,000 – ₩670,000 |
Flooring Standard · Laminated wood floor (gangmaru) | 12.9 ㎡ | ₩370,000 – ₩520,000 |
Lighting Standard · Designer LED + indirect lighting | 14 floor ㎡ | ₩250,000 – ₩360,000 |
Balcony painting Standard · Elastic coating | 2.8 ㎡ | ₩50,000 – ₩70,000 |
Material logistics (estimate) Estimate
Material delivery
₩300,000 – ₩800,000
Hoisting & elevator protection
₩200,000 – ₩500,000
- Labor uses official market wages (CAK, 2026-09-01); materials and labor input are estimates. Actual quotes vary with site conditions and brands, so compare on-site quotes from 2–3 contractors.
- Replacing apartment windows may require notifying the management office and neighbors' consent.
Find contractors with this estimate
Post a request with this estimate and we'll recommend matching contractors.
Price basis and sources
Labor = official market wage × labor input per unit. Labor input, materials and trade mix are estimates not yet checked against official data, so treat amounts as reference ranges.
- OfficialConstruction Association of Korea, 2026 H2 Construction Wage Survey (market wage rates, published 2026-09-01, surveyed May 2026)Source
- EstimateLabor input per unit (worker-days)To be checked against MOLIT's Standard Construction Estimating Guide
- EstimateTrade mix per work typeTo be checked against actual site data
- EstimateMaterial costsTo be checked against Public Procurement Service price data and price guides
- EstimateMaterial logistics (delivery, travel, hoisting, waste removal)To be replaced with partner supplier quotes and anonymous quote-check data
- EstimateRegion and occupied-home factors, 7% overhead
Construction Association of Korea, 2026 H2 Construction Wage Survey (market wage rates, published 2026-09-01, surveyed May 2026)
| 1002 | General laborer | ₩172,698 |
| 5014 | Demolition worker | ₩261,108 |
| 1024 | Window installer | ₩248,547 |
| 1075 | Electrician | ₩276,108 |
| 1028 | Tiler | ₩294,379 |
| 1029 | Painter | ₩268,225 |
| 1030 | Interior finisher | ₩258,904 |
| 1031 | Paperhanger | ₩229,833 |
| 1026 | Waterproofer | ₩233,163 |
| 1039 | Plumber | ₩249,073 |
| 1042 | Sanitary fitter | ₩221,435 |
| 1023 | Carpenter | ₩282,990 |
| 5012 | Flooring installer * | ₩257,926 |